PRE CONSTRUCTION


Schedules

Prepare baseline construction schedules in compliances with specs and plans in Primavera with earned values reports and resource allocation, for project manager and superintendents reviews.

Submittal Coordination

Prepare detailed Portfolios which identify the correct products specified for various projects. Reviewing the drawings and fixture schedules and coordinate with project stake holders.

Submittal Registers

Prepare submittal registers based upon plans and specs, including lead time for long procurement items based upon the 16 and 49 division CSI Specifications.

Test Logs

Prepare test logs to ensure all required test and related reports are prepared per plan and specifications

Shop Drawings Assistance

Prepare technical drawings with engineering designs for the final shop drawings issued ‘Good For Construction.

Request for Information

Prepare a list of RFIs at the outset of project to preview plan and specifications inconsistencies to reduce delays during construction.